Crematory Kinderode
Range of services:
Supply and installation of a plant consisting of gas
fired cremator, flue gas channels, flat bag filter plant in compliance
(current flow procedure) with the German regulation (27th BImSchV)
including deposit of dioxin, furan and mercury, induced draught fan, suction
fan, automatically
charging machine, automatic control with visualization of the plant
parameters and emission control measurement.
Completion: December 2006
Crematory Bochum Range of services:
Renewal and modernization of two cremation ovens. On basis of the
continuously further developed Heinicke flat bed type oven the
capacity of the plant has increased by reduction of cremation time
from average 80 minutes down to 60 minutes. Optimization of
environmental behaviour by reduction of consumption of natural gas
from 40 m3 to less than 15 m3.
Completion: November 2006

Crematory Wat Thepsirintrawas, Bangkok (Thailand) Range of
services:
Planning, delivery and reconstruction of entire cremation equipment
for the Thai Royal Dynasty. Supervision of construction and
commissioning.
Completion: May 2006

Oven temple at Wat Thepsirintrawas
Thermal Sewerage Sludge
Treatment Plant Neu-Ulm Range of services:
Reconstruction and extension of fluidized-bed oven for incineration
of sewerage sludge. Renewal of brick-lining and of pipes for
combustion air. Delivery, assembly and commissioning of automation
instrumentation for fluidiced-bed oven.
Completion: November 2006

Air conveying line at fluidized-bed oven

CHP Plant Travemuende Range of services:
Connection of generally overhauled CHP module including delivery of
safety engineering and start-up operation.
Completion: 2006

Crematory Hameln Range of services:
New brick lining of oven and optimization of plant control.
Completion: 2006
CHP Plant for Wood Verden Range of services:
Tearing down of two waste-heat recovery boiler and subsequent
assembly and adjustment of two new boiler systems to existing pipe
grid as well as commissioning and start-up operation.
Completion: 2005
Crematory Verden Range of services:
Supply and installation of a plant consisting of gas
fired cremator, flue gas channels, flat bag filter plant in compliance
(current flow procedure) with the German regulation (27th BImSchV)
including deposit of dioxin, furan and mercury, induced draught fan, suction
fan, automatically
charging machine, automatic control with visualization of the plant
parameters and emission control measurement. Completion: 2005

Inside view of Crematory Verden
Crematory Luedenscheid
Range of services:
Civil engineering and building construction of the comlpete
crematory.
Supply and installation of an incineration plant consisting of a gas
fired furnace, flue gas channels, flat bag filter plant in compliance
(current flow procedure) with the German regulation (27th BImSchV)
including deposit of dioxins, furans and mercury, induced draught
fan, suction fan, automatically
charging machine, automatic control with visualization of the plant
parameters and emission control measurement.
Completion: 2005

Outside view of Crematory Luedenscheid
Crematory Tornesch
Range of services:
Civil engineering and building construction of the comlpete
crematory. Supply and installation of an incineration plant consisting of a gas
fired furnace, flue gas channels, flat bag filter plant in compliance
(current flow procedure) with the German regulation (27th BImSchV)
including deposit of dioxins, furans and mercury, induced draught
fan, suction fan, automatically
charging machine, automatic control with visualization of the plant
parameters and emission control measurement.
For the first time in this project an ash mill was introduced
which was designed by H.R. Heinicke and constrcuted together with a
mechanical engineering company. In future this type of ash mill will
be a a standard equipment part of Crematories designed by H.R.
Heinicke GmbH.
The ash mill is used for feeding the urns and is equipped with
metal separator, complete control and dust absorbance.
Completion: 2004

Ash mill in the Crematory Tornesch
Crematory Lichterfelde
Range of services:
Supply and installation of an incineration plant consisting of a gas
fired furnace, flue gas channels, flat bag filter plant in compliance
(current flow procedure) with the German regulation (27th BImSchV)
including deposit of dioxins, furans and mercury, induced draught
fan, suction fan, automatically
charging machine, automatic control with visualization of the plant
parameters and emission control measurement.
Completion: 2004

Outside view of delivery area at Crematory Lichterfelde
Crematory Fuerstenzell
Range of services:
Supply and installation of an incineration plant consisting of a gas
fired furnace, flue gas channels, flat bag filter plant in compliance
(current flow procedure) with the German regulation (27th BImSchV)
including deposit of dioxins, furans and mercury, induced draught
fan, suction fan, automatically
charging machine, automatic control with visualization of the plant
parameters and emission control measurement.
Completion: 2004
|
Outside view of Crematory Fuerstenzell |
Crematory Hohenems, Austria
Range of service:
Replacement of the cremator and installation of an automatically
charging machine
Completion: 2003
|
Creamtor oven at Crematory Hohenems, Austria |
|
 |
|
Crematory for small pets,
Munich
Range of service:
Replacement of a cremator for small pets (maximum of 100 kg).
Installation of a 2nd chamber in complaince to the german regulation
17th BImSCHV. Installation of DENOX Plant and an automatically
charging machine
Completion: 2003
Adsorbens recycling for Waste Incineration Plant, Bremen
Range of service:
Supply and installation of adsorbens recycling for an existing
flue gas filter plant
Completion: 2002
Crematory
Traunstein
Range of services:
Supply and installation of an incineration plant consisting of a gas
fired furnace, flue gas channels, flat bag filter plant in compliance
(current flow procedure) with the German regulation (27th BImSchV)
including deposit of dioxins, furans and mercury, induced draught
fan, suction fan, automatic control with visualization of the plant
parameters and emission control measurement. Construction of the steel
platforms and staircase.
First realization of coffin charging machine within an automatic
ash sweeping construction.
Completion: 2001
Crematory
Oldenburg
Range of services:
Supply and installation of an incineration plant consisting of a gas
fired furnace, flue gas channels, flat bag filter plant in compliance
(current flow procedure)with the 27th BImSchV including deposit of
dioxins, furans and mercury, induced draught fan, suction fan, automatic
control with visualization of the plant parameters and emission control
measurement. Construction of the steel platforms and staircase
Completion: 2000
Crematory
Bochum - main cemetery field
Range of services:
Supply and installation of two separate lines with gas fired
furnaces,
two flue gas ducts with fireproof lining, two flue gas heat exchanger
(gas/water), two advanced separators in front of two flat bag filter
plants with induced draught fans, a coffin insertion device for both
facilities, a complete supply of compressed air, a complete automatic
pressure control for the water system.
A heat recovery system, the heat is fed into the existing heat system.
Re-cooling equipment for the removal of the not used amount of heat
within a receptacle for the spray unit including the water treatment.
The entire electric control and measurement occurs via Direct Digital
Control (DDC). Insulation of the entire system.
Improvement of the incineration plant fit in 1991, consisting of:
Conversion of the filter plant with deposit of dioxins and furans,
fitting a flue gas emergency avoidance, replacement of the open re-cooling-
system further using a closed system (water/air), automatic control
with visualization.
Completion: 2000

Crematory
Munich - east cemetery
Range of services:
First step: modernization of 5 incineration plants, new fireproof
lining inside the oven, fitting of a post-combustion chamber, removal
of the gas supplementary heating.
Finished: 1996
Second building section: realizing the flue gas cleaning plant in
compliance with the 27th BimSchV , including deposit of dioxins, furans
and mercury, utilization of heat emission , combustion air
preheating,
visualization at the operators desk , fully-automatic supply of
additive,
emission control, computer for measured values.
Completion: 1999

Crematory
Hanover-Lahe
Range of services:
First building section: realization of two incineration plants with
gas fired furnace, flue gas ducts, two coffin insertion machines,
construction of steel platforms and stairs.
Second building section: the 3rd incineration plant was realized with
same supplies and range of services.
Completion: 1998

Crematory
Quedlinburg
Range of services:
Supply and installation of two incineration plants with gas fired
furnace, two fireproof lined flue gas ducts, two flue gas heat exchanger(flue
gas/water), two advanced separators, two flat bag filter plants with
induced draught fans, an ash processing plant, electric control and
measurement.
Building time including excavation and building construction with
adaptation of building construction to a building classified as historical
monument: 1/2 years

Crematory
Magdeburg - western cemetery
Range of services:
Supply and installation of three incineration plants, gas-fired, each
with a fixed coffin insertion machine, flue gas ducts, flue gas heat
exchanger(flue gas/water), prefilters, flat bag filter plants with
induced draught fans, ash processing plant, measuring, duty and control
technology, inclusive DDC control, visualization at the operators
desk , analysis of flue gas furnishings, thermal insulation, maintenance
and implementation platforms as well as a chimney plant.
Time for realization including excavation and building construction
as well as redevelopment of the building classified as a historical
monument: 2 years

Crematory
Hamburg-Oejendorf, Cemetery Oejendorf
Range of services:
First building section: reconstruction of four incineration facilities
( flat-bed-oven, (completed 89/90), then realizing a gas fired
furnace.
Second building section : reconstruction of the flue gas cleaning
in 1993, supply and installation of 4 flat bag filters with advanced
separators and induced draught fans, adaptations for the 4 flue gas
ducts, 4 flue gas heat exchanger ( gas/water), a heat recovery system
used for heating and cooling purposes.
Time for realization of the 2nd building section including excavation
and construction: 1 year

Crematory
Kiel
Range of services:
First building section ( completed 1991): supply and installation
of fireproof linings for each of the four existing oven as well as
a post-combustion chamber for each oven, four new gas supplementary
burner, 4 electric controls with flue gas analysis engineering.
Second building section ( building construction began in January
1994): supply and installation of 4 flat bag filters with advanced
separators and induced draught fans. Adaptation of the flue gas
ducts, of 4 flue gas heat exchanger (gas/water).
Time for realization including excavation and building
construction:
1 year

Crematory
Schwerin
Range of services:
Supply and installation of 2 flat-bed cremator with gas fired
furnace,
two fireproof lined flue gas ducts, two flue gas heat exchanger (flue
gas/water), two advanced separators, two flat bag filter plants
with induced draught fans, an ash processing plant, an electric
control and a measurement via DDC , visualization at the operators
desk.
Time for realization including excavation and building
construction:
1 year

Crematory
Flensburg, Friedenshuegel
Range of services:
Supply and assembly of 2 flat-bed-oven with gas fired furnace, two
fireproof lined flue gas ducts, two flue gas heat exchanger(flue
gas/water), two flat bag filter plants for the deposit of mercury (current flow
procedure), dioxins and furans, a heat recovery system,
used for heating purposes and an electric control and an measurement
via DDC , visualization at the operators desk.
Time for realization including building construction: 9 months

Crematory
Luebeck
Range of services:
Supply and installation of 2 flat-bed-oven with gas fired furnace,
flue gas ducts, flat bag filter plants in compliance (current flow
procedure) with the 27th BImSchV including deposit of dioxins, furans
and mercury.
Construction of steel platforms and staircase.

Crematory
Heilbronn
Range of services:
Reconstruction of 2 story cremators as well as the post-combustion
chamber for each oven, four new gas supplementary burner, delivery
and erection of two flue gas heat exchanger(1200 kW) in accordance
to the temperature value operating and speed regulated pumps, inertial
forced separators, dry flue gas cleaning with flat bag filters,
compressed air supply, speed regulated induced draught fan, water/air
re-cooling system (maximum power 1200kW), a heat recovery system
used for heating purposes.
Flue gas ducts (under floor construction) with automatic change
from cremator one to cremator two. Electric control and
measurement.
Suction fan for furnace (frequency controlled).
Time for realization including building construction: 10 months

Crematory
Muehlhausen/Thuringia
Range of services:
Reconstruction of 2 story cremators as well as the post-combustion
chamber for each oven, four new gas supplementary burner, delivery
and erection of two flue gas heat exchanger(1200 kW) in accordance
to the temperature value operating and speed regulated pumps, inertial
forced separators, dry flue gas cleaning with flat bag filters,
compressed air supply, speed regulated induced draught fan, water/air
re-cooling system (maximum power 1200kW), a heat recovery system
used for heating purposes.
Flue gas ducts (under floor construction) with automatic change
from cremator one to cremator two. Electric control and
measurement.
Suction fan for furnace (frequency controlled).
Time for realization including construction: 6 months

Crematory
Frankfurt/Oder
Range of services:
Reconstruction of 2 story cremators as well as the post-combustion
chamber for each oven including the gas supplementary burner , realization
of two flue gas cleaning plants in compliance with the 27th BImSchV
, including deposit of dioxins, furans and mercury, two flue gas
heat exchanger, utilization of heat emission for heating purposes,
complete chimney plant, visualization at the operators desk , emission
control, computer for measured values. Construction of steel platforms
and staircase.
Begin of Commissioning: September 1998

Crematory
Jena, northern cemetery
Range of services:
Reconstruction of one story cremator as well as the post-combustion
chamber and a new gas supplementary burner, realization of a flue
gas cleaning plant in compliance with the 27th BImSchV , including
deposit of dioxins, furans and mercury, a flue gas heat exchanger,
utilization of heat emission for heating purposes, visualization
at the operators desk , emission control, computer for measured
values. Complete compressed air supply. Construction of steel platforms
and staircase.
Contact:
H · R · Heinicke GmbH | Marie-Curie-Straße 5 |
D - 27283 Verden
Phone: +49 42 31/67 76-0 | Fax: +49 42 31/67 76-10 | info(at)heinicke-gmbh.de
|
 |
 |