Our fields of activity:

  • construction of firing systems and furnaces
  • machinery manufacturing and plant construction
  • cremation plants
  • facilities for animal cremation
  • turn key projects
Concerning the above mentioned fields of activity we both planned and realized individual facilities for our customers as well as several self-developed parts of equipments and technologies. We will introduce you to our concentration of forces - cremation plants, flat-bed cremator and flue gas cleaning facilities - within the following pages.

To find our references, please have a look at the end of this page.

Don't hesitate to contact us if you need more specialized and detailed information.To send the documents upon request will be a pleasure for us. We are looking forward to receiving your message and refer to it soon.












  H. R. Heinicke Home
Cremation Plant


In this page a scheme of a cremation plant as well as an animation of the entire process is provided. It shows the main units of the plant built in Germany including the flue gas cleaning unit to keep the air pollution below the limits of the German regulation 27. BImSchV.



1 coffin 13 flue gas sliding valve
2 coffin conveyor 14 flue gas heat exchanger
3 sliding furnace door 15 cyclone filter
4 stack 16 reactor
5 main burning chamber 17 filter
6 main burner 18 rotary valve
7 cease-burning chamber 19 residue drum
8 cease-burner 20 screw conveyor
9 afterburning chamber 21 flue gas fan
10 afterburner 22 chimney
11 flue gas duct 23 compressed air
12 combustion air fan 24 heat exchanger / chiller






















Animation






  H. R. Heinicke Home
Flat-Bed Cremator


The special construction of the H · R · Heinicke - the flat-bed cremator - consists of a furnace slide door, a cremation chamber (primary combustion chamber), an afterburning chamber (secondary combustion chamber), a cease-burning chamber and as well an ash cooling zone. The mentioned areas of the oven are completely produced by using materials of high quality, mass-produced fire-bricks and insulating materials including the necessary specially shaped bricks. The material qualities are selected according to the different thermal, chemical as well as mechanical requirements.

The material selection is based upon the H · R · Heinicke know-how resulting from more than one hundred designed and implemented facilities which are operating successfully.

The main burning chamber and the afterburning chamber located upon each other represent a compact construction with an optimum heat exchange between the combustion chambers. The result is a very short preheating time and extremely low primary energy consumption with the advantage that no preheating of the combustion air is necessary. The supply of the combustion air is effected by means of a combustion air blower with the result of lower investments and saving of maintenance costs as well as electrical energy consumption above all.

Alternately three burners operating with oil or gas ensure the supply of additional energy in the main burning chamber, afterburning chamber and cease-burning chamber if necessary.

According to our experiences the operation of the burner will be only necessary in the beginning of the cremation for preheating the whole furnace system. During the cremation the temperature is normally released by the combustion of the coffin and the body which are sufficient for an independent combustion. Only in the end of the cremation process it may be necessary that especially the afterburner readjusts the temperature to a value of 850 °C in the afterburning zone. This value is required by the authorities.


The cremation process will be controlled by Direct Digital Control (DDC) to guarantee secure operations. Measurements of temperature and oxygen in co-operation with the combustion air and the burning system ensures that optimum combustion conditions will be achieved at any time.

In a flat bed furnace the body remains on the floor of the primary combustion chamber during the whole cremation process. Thus the carrying of ash particles within the flue gas will be minimized compared to the free-falling type furnace.

After the combustion is nearly completed only the residues of the incineration will be fed into the cease-burning chamber and thereafter into the cooling zone.

H · R · Heinicke´s latest development, the coffin insertion and ashes-removal system ensures
  • the movement of coffins adapted to all usual shapes of coffins and their prompt insertion into the primary combustion chamber.
  • the complete sweeping of ashes into the cease-burning chamber in view of careful treatment of the combustion chamber floor and comfortable handling.
  • fast operation to minimize the cooling of the furnace to avoid the inlet of cold air.
The design of the machine corresponds to the expected mechanical and thermal charges (coffin weights up to 300 kg). Safety directed control of the machine is achieved by directed link with the furnace. The machine consists of a robust steel construction which is located in starting position in a pit in front of the flat-bed cremator in the coffin insertion zone. The supporting beams of the coffin insertion machine are in flush with the floor.

The insertion machine developed by H · R · Heinicke complies with the intended targets in every respect.

Coffin insertion machine operating in ashes-removal modus

A view into a cremation hall











  H. R. Heinicke Home
Flue Gas Cleaning


Flue gases caused by the cremation are chilled by flowing through the flue gas heat exchanger. There is one chiller for each cremation line. Via the subsequent cyclone filter which works by using the force of gravity larger dust particles and sparks within the flue gases are carried out. The flue gas itself leaves the cyclone and is led to the filter (e.g. flat bag filter) . The flue gases are cleaned there by using additives which are available in the reactor of the filter plant and the subordinate filter elements. The quality of the cleaned flue gas (cleaned gas) is measured by the ejection instrumentation (CO, O2 and dust) realized in the filter plant and flue gas fan and recorded by the ejection evaluating arithmetician device. Coming from the induced draught fan the cleaned gases are discharged to atmosphere through the chimney installation.

The flue gas heat exchanger is cleaned automatically by using a soot-blower. The filter bags of the filter plant are cleaned automatically depending on differential pressure. The cleaning works by using compressed air - dry and oil-free.




View to the filter plant

  H. R. Heinicke Home
References

Representative project descriptions of crematories in summary

Crematory Neubrandenburg (new)
Crematory Kinderode
Crematory Bochum

Crematory at Thepsirintrawas, Bangkok

Thermal Sewerage Sludge Treatment Neu-Ulm

CHP Plant Travemuende

Crematory Hameln

CHP Plant for Wood Verden
Crematory Verden
Crematory Luedenscheid

Crematory Tornesch

Crematory Lichterfelde

Crematory Fuerstenzell

Crematory Hohenems
Crematory for small pets, Munich
Adsorbens recycling for Waste Incineration Plant
Crematory Traunstein
Crematory Oldenburg
Crematory Bochum - main cemetery field
Crematory Munich east cemetery
Crematory Hanover-Lahe
Crematory Quedlinburg
Crematory Magdeburg - western cemetery
Crematory Hamburg-Oejendorf, Cemetery Oejendorf
Crematory Kiel
Crematory Schwerin
Crematory Flensburg, Friedenshuegel
Crematory Luebeck
Crematory Heilbronn
Crematory Muehlhausen/Thuringia
Crematory Frankfurt/Oder
Crematory Jena, northern cemetery

 



Crematory Kinderode

Range of services:
Supply and installation of a plant consisting of  gas fired cremator, flue gas channels, flat bag filter plant in compliance (current flow procedure) with the German regulation (27th BImSchV) including deposit of dioxin, furan and mercury, induced draught fan, suction fan, automatically charging machine, automatic control with visualization of the plant parameters and emission control measurement.

Completion: December 2006

Crematory Bochum

Range of services:
Renewal and modernization of two cremation ovens. On basis of the continuously further developed Heinicke flat bed type oven the capacity of the plant has increased by reduction of cremation time from average 80 minutes down to 60 minutes. Optimization of environmental behaviour by reduction of consumption of natural gas from 40 m3 to less than 15 m3.

Completion: November 2006

Crematory Wat Thepsirintrawas, Bangkok (Thailand)

Range of services:
Planning, delivery and reconstruction of entire cremation equipment for the Thai Royal Dynasty. Supervision of construction and commissioning.

Completion: May 2006

Oven temple at Wat Thepsirintrawas

Thermal Sewerage Sludge Treatment Plant Neu-Ulm

Range of services:
Reconstruction and extension of fluidized-bed oven for incineration of sewerage sludge. Renewal of brick-lining and of pipes for combustion air. Delivery, assembly and commissioning of automation instrumentation for fluidiced-bed oven. 

Completion: November 2006

Air conveying line at fluidized-bed oven

CHP Plant Travemuende

Range of services:
Connection of generally overhauled CHP module including delivery of safety engineering and start-up operation.

Completion: 2006

Crematory Hameln

Range of services:
New brick lining of oven and optimization of plant control.

Completion: 2006

CHP Plant for Wood Verden

Range of services:
Tearing down of two waste-heat recovery boiler and subsequent assembly and adjustment of two new boiler systems to existing pipe grid as well as commissioning and start-up operation. 

Completion: 2005

Crematory Verden

Range of services:
Supply and installation of a plant consisting of  gas fired cremator, flue gas channels, flat bag filter plant in compliance (current flow procedure) with the German regulation (27th BImSchV) including deposit of dioxin, furan and mercury, induced draught fan, suction fan, automatically charging machine, automatic control with visualization of the plant parameters and emission control measurement.

Completion: 2005

Inside view of Crematory Verden

 

Crematory Luedenscheid

Range of services:
Civil engineering and building construction of the comlpete crematory. Supply and installation of an incineration plant consisting of a gas fired furnace, flue gas channels, flat bag filter plant in compliance (current flow procedure) with the German regulation (27th BImSchV) including deposit of dioxins, furans and mercury, induced draught fan, suction fan, automatically charging machine, automatic control with visualization of the plant parameters and emission control measurement.

Completion: 2005

Outside view of Crematory Luedenscheid

Crematory Tornesch

Range of services:
Civil engineering and building construction of the comlpete crematory. Supply and installation of an incineration plant consisting of a gas fired furnace, flue gas channels, flat bag filter plant in compliance (current flow procedure) with the German regulation (27th BImSchV) including deposit of dioxins, furans and mercury, induced draught fan, suction fan, automatically charging machine, automatic control with visualization of the plant parameters and emission control measurement.

For the first time in this project an ash mill was introduced which was designed by H.R. Heinicke and constrcuted together with a mechanical engineering company. In future this type of ash mill will be a a standard equipment part of Crematories designed by H.R. Heinicke GmbH.

The ash mill is used for feeding the urns and is equipped with metal separator, complete control and dust absorbance.

Completion: 2004


        

Ash mill in the Crematory Tornesch

Crematory Lichterfelde

Range of services:
Supply and installation of an incineration plant consisting of a gas fired furnace, flue gas channels, flat bag filter plant in compliance (current flow procedure) with the German regulation (27th BImSchV) including deposit of dioxins, furans and mercury, induced draught fan, suction fan, automatically charging machine, automatic control with visualization of the plant parameters and emission control measurement.

Completion: 2004




Outside view of delivery area at Crematory Lichterfelde

 

Crematory Fuerstenzell

Range of services:
Supply and installation of an incineration plant consisting of a gas fired furnace, flue gas channels, flat bag filter plant in compliance (current flow procedure) with the German regulation (27th BImSchV) including deposit of dioxins, furans and mercury, induced draught fan, suction fan, automatically charging machine, automatic control with visualization of the plant parameters and emission control measurement.

Completion: 2004


Outside view of Crematory Fuerstenzell

 

Crematory Hohenems, Austria

Range of service:

Replacement of the cremator and installation of an automatically charging machine

Completion: 2003






Creamtor oven at Crematory Hohenems, Austria

   

 

 

 

 

Crematory for small pets, Munich

Range of service:

Replacement of a cremator for small pets (maximum of 100 kg). Installation of a 2nd chamber in complaince to the german regulation 17th BImSCHV. Installation of DENOX Plant and an automatically charging machine

Completion: 2003

Adsorbens recycling for Waste Incineration Plant, Bremen

Range of service:

Supply and installation of adsorbens recycling for an existing flue gas filter plant

Completion: 2002

Crematory Traunstein

Range of services:
Supply and installation of an incineration plant consisting of a gas fired furnace, flue gas channels, flat bag filter plant in compliance (current flow procedure) with the German regulation (27th BImSchV) including deposit of dioxins, furans and mercury, induced draught fan, suction fan, automatic control with visualization of the plant parameters and emission control measurement. Construction of the steel platforms and staircase.

First realization of coffin charging machine within an automatic ash sweeping construction.

Completion: 2001

flat-bed cremator at crematory Traunstein
flue gas heat exchanger and flue gas cleaning facility at crematory Traunstein



Crematory Oldenburg

Range of services:
Supply and installation of an incineration plant consisting of a gas fired furnace, flue gas channels, flat bag filter plant in compliance (current flow procedure)with the 27th BImSchV including deposit of dioxins, furans and mercury, induced draught fan, suction fan, automatic control with visualization of the plant parameters and emission control measurement. Construction of the steel platforms and staircase


Completion: 2000

view to flue gas duct at crematory Oldenburg
completed flat-bed cremator at crematory Oldenburg



Crematory Bochum - main cemetery field

Range of services:
Supply and installation of two separate lines with gas fired furnaces, two flue gas ducts with fireproof lining, two flue gas heat exchanger (gas/water), two advanced separators in front of two flat bag filter plants with induced draught fans, a coffin insertion device for both facilities, a complete supply of compressed air, a complete automatic pressure control for the water system.

A heat recovery system, the heat is fed into the existing heat system. Re-cooling equipment for the removal of the not used amount of heat within a receptacle for the spray unit including the water treatment. The entire electric control and measurement occurs via Direct Digital Control (DDC). Insulation of the entire system.

Improvement of the incineration plant fit in 1991, consisting of:
Conversion of the filter plant with deposit of dioxins and furans, fitting a flue gas emergency avoidance, replacement of the open re-cooling- system further using a closed system (water/air), automatic control with visualization.

Completion: 2000


Crematory Munich - east cemetery

Range of services:
First step: modernization of 5 incineration plants, new fireproof lining inside the oven, fitting of a post-combustion chamber, removal of the gas supplementary heating.

Finished: 1996

Second building section: realizing the flue gas cleaning plant in compliance with the 27th BimSchV , including deposit of dioxins, furans and mercury, utilization of heat emission , combustion air preheating, visualization at the operators desk , fully-automatic supply of additive, emission control, computer for measured values.

Completion: 1999


Crematory Hanover-Lahe

Range of services:
First building section: realization of two incineration plants with gas fired furnace, flue gas ducts, two coffin insertion machines, construction of steel platforms and stairs.


Second building section: the 3rd incineration plant was realized with same supplies and range of services.

Completion: 1998


Crematory Quedlinburg

Range of services:
Supply and installation of two incineration plants with gas fired furnace, two fireproof lined flue gas ducts, two flue gas heat exchanger(flue gas/water), two advanced separators, two flat bag filter plants with induced draught fans, an ash processing plant, electric control and measurement.

Building time including excavation and building construction with adaptation of building construction to a building classified as historical monument: 1/2 years


Crematory Magdeburg - western cemetery

Range of services:
Supply and installation of three incineration plants, gas-fired, each with a fixed coffin insertion machine, flue gas ducts, flue gas heat exchanger(flue gas/water), prefilters, flat bag filter plants with induced draught fans, ash processing plant, measuring, duty and control technology, inclusive DDC control, visualization at the operators desk , analysis of flue gas furnishings, thermal insulation, maintenance and implementation platforms as well as a chimney plant.

Time for realization including excavation and building construction as well as redevelopment of the building classified as a historical monument: 2 years


Crematory Hamburg-Oejendorf, Cemetery Oejendorf

Range of services:
First building section: reconstruction of four incineration facilities ( flat-bed-oven, (completed 89/90), then realizing a gas fired furnace. Second building section : reconstruction of the flue gas cleaning in 1993, supply and installation of 4 flat bag filters with advanced separators and induced draught fans, adaptations for the 4 flue gas ducts, 4 flue gas heat exchanger ( gas/water), a heat recovery system used for heating and cooling purposes.


Time for realization of the 2nd building section including excavation and construction: 1 year


Crematory Kiel

Range of services:
First building section ( completed 1991): supply and installation of fireproof linings for each of the four existing oven as well as a post-combustion chamber for each oven, four new gas supplementary burner, 4 electric controls with flue gas analysis engineering.

Second building section ( building construction began in January 1994): supply and installation of 4 flat bag filters with advanced separators and induced draught fans. Adaptation of the flue gas ducts, of 4 flue gas heat exchanger (gas/water).

Time for realization including excavation and building construction:
1 year

Crematory Schwerin

Range of services:
Supply and installation of 2 flat-bed cremator with gas fired furnace, two fireproof lined flue gas ducts, two flue gas heat exchanger (flue gas/water), two advanced separators, two flat bag filter plants with induced draught fans, an ash processing plant, an electric control and a measurement via DDC , visualization at the operators desk.

Time for realization including excavation and building construction:
1 year

Crematory Flensburg, Friedenshuegel

Range of services:
Supply and assembly of 2 flat-bed-oven with gas fired furnace, two fireproof lined flue gas ducts, two flue gas heat exchanger(flue gas/water), two flat bag filter plants for the deposit of mercury (current flow procedure), dioxins and furans, a heat recovery system, used for heating purposes and an electric control and an measurement via DDC , visualization at the operators desk.

Time for realization including building construction: 9 months

Crematory Luebeck

Range of services:
Supply and installation of 2 flat-bed-oven with gas fired furnace, flue gas ducts, flat bag filter plants in compliance (current flow procedure) with the 27th BImSchV including deposit of dioxins, furans and mercury.

Construction of steel platforms and staircase.

Crematory Heilbronn

Range of services:
Reconstruction of 2 story cremators as well as the post-combustion chamber for each oven, four new gas supplementary burner, delivery and erection of two flue gas heat exchanger(1200 kW) in accordance to the temperature value operating and speed regulated pumps, inertial forced separators, dry flue gas cleaning with flat bag filters, compressed air supply, speed regulated induced draught fan, water/air re-cooling system (maximum power 1200kW), a heat recovery system used for heating purposes.

Flue gas ducts (under floor construction) with automatic change from cremator one to cremator two. Electric control and measurement. Suction fan for furnace (frequency controlled).

Time for realization including building construction: 10 months

Crematory Muehlhausen/Thuringia

Range of services:
Reconstruction of 2 story cremators as well as the post-combustion chamber for each oven, four new gas supplementary burner, delivery and erection of two flue gas heat exchanger(1200 kW) in accordance to the temperature value operating and speed regulated pumps, inertial forced separators, dry flue gas cleaning with flat bag filters, compressed air supply, speed regulated induced draught fan, water/air re-cooling system (maximum power 1200kW), a heat recovery system used for heating purposes.

Flue gas ducts (under floor construction) with automatic change from cremator one to cremator two. Electric control and measurement. Suction fan for furnace (frequency controlled).

Time for realization including construction: 6 months

Crematory Frankfurt/Oder

Range of services:
Reconstruction of 2 story cremators as well as the post-combustion chamber for each oven including the gas supplementary burner , realization of two flue gas cleaning plants in compliance with the 27th BImSchV , including deposit of dioxins, furans and mercury, two flue gas heat exchanger, utilization of heat emission for heating purposes, complete chimney plant, visualization at the operators desk , emission control, computer for measured values. Construction of steel platforms and staircase.

Begin of Commissioning: September 1998

Crematory Jena, northern cemetery

Range of services:
Reconstruction of one story cremator as well as the post-combustion chamber and a new gas supplementary burner, realization of a flue gas cleaning plant in compliance with the 27th BImSchV , including deposit of dioxins, furans and mercury, a flue gas heat exchanger, utilization of heat emission for heating purposes, visualization at the operators desk , emission control, computer for measured values. Complete compressed air supply. Construction of steel platforms and staircase.




Contact:
H · R · Heinicke GmbH | Marie-Curie-Straße 5 | D - 27283 Verden
Phone: +49 42 31/67 76-0 | Fax: +49 42 31/67 76-10 | info(at)heinicke-gmbh.de